Common Effluent Treatment Plant
Common Effluent Treatment Plant (CETP)

(Common Effluent Treatment Plant aided with Advanced Oxidation Technology - FCR, Common Multi Effect Evaporator, Spray Dryer)

PROUDLY CELEBRATES 30 YEARS OF CONTINUOUS SERVICES

INTRODUCTION

  • Vatva industrial estate Ahmedabad was established in the Year 1968.
  • The Green Environment Services co-op. Society Ltd. (GESCSL) was formed in 1992 under the society act to establish Common Facilities to cater the issues of Treatment of Industrial Waste water.
  • It is one of the oldest and largest estate in Gujarat, spreaded over the area of more than 527 hectors in 4 phases.
  • Vatva has an annual turnover of more than Rs. 15000 crores.
  • Exports of more than Rs. 7500 crores.
  • 1.0 lakhs direct and 0.5 lakhs indirect employees.
  • Vatva Industrial Estate has more than 4000 enterprises, comprises of around 15% Large & Corporate houses and 85% MSMEs. The estate houses varied industries like Dye & Dye-intermediates, plastics, light & heavy engineering, Machinery and components, chemicals, paints, pharmaceuticals, foundries, textiles etc.
  • Institutes like CIPET, National Leather Research Institute, National Standards Laboratory and Indo-German Tool Room are also part of Vatva.
CURRENT STATUS
Vatva is the only estate in the country which has all the pollution control facilities under one roof as details below

Facility Commissioning Year Capacity Investment Rs in cr No. of Beneficiary Members Annual O&M, Rs in crores
CETP (For treatment of industrial Waste water) September 1998 16 MLD 74.41 674 30
TSDF March 2003 - May 2013 12.25 Lac MT 14.50 Exhausted -
Common Spent acid treatment and management services (NOVEL) (Separate entity) November 2009 1000 Mt/d (400 to 600 MU d treatment + 300 to 400 Mt /d reuse) 45.00 215 33
MEE (for concentrated industrial waste water) March 2014 300 KLD 18.00 223 30
Spray Drying System:03 January 2015 624 KLD 18.00
Fenton Catalytic Reactor June 2021 30 MLD 75.00 674 30
Total 244.91 674 123
Regd. Office & CETP Site: Plot No. 244-251, Phase II - GIDC Estate, Vatva, Ahmedabad - 382 445. Tele.: 079 25892283, 25832449, Mob.: +91 98250 18947, 75730 17676, 75730 27676 E Mail: info@gescsl.com, Web: www.gescsl.com
OUR INNOVATION
  • Most efficient internal effluent collection system for systematic quality and quantity control over the effluent discharged by member units. 94-SCADA PLC based Sump Rooms for quantifying effluent discharged by each member unit.
  • Auto samplers are installed at all 94 Sump Rooms for automatic composite and continuous sample collection and then for analysis of the effluent discharged by each member unit.
  • To keep watch on plant performance, Auto Samplers are installed at all stages of treatment units, hence No manual sampling anywhere.
  • Installation of 30 MLD Advanced Oxidation Technology i.e. FCR Plant to achieve GPCB Discharge Norms by removing Non-biodegradable matters from the effluent.
  • Developed software to maintain records for tracking performance of daily Operation and Maintenance of the Plant.
UNIQUNESS
  • Only estate in the country, which has all the Common Environmental Pollution Control Facilities i.e., CETP aided with advanced oxidation treatment technology, TSDF, Comon MEE & Spray Dryer and Common Spent Acid Management Facility at one place working under co-operative body.
  • Such huge amount (i.e., 624 KLD) of high TDS effluent is being treated and safely disposed through MEE/Spray Dryer. Such huge amount (i.e., 1000 KLD) of spent acid is neutralized at Novel Spent Acid Management Facility.
  • State of art NABL Accredited Laboratory.
  • Mobile Application has been launched for MEE & Spray dryer and NOVEL for member units to book the tankers, raise bill payment, raise quarries and view the results, hence nothing is manual basis.
  • Under Continuous Effluent Monitoring System (CEMS), Online Flow, pH, TOC, COD, BOD, NH3 and TSS of the CETP discharge are being transferred to CPCB and GPCB on real time basis.
  • Established a Help Desk for our member units, seeking any help related application under Rule-9 of H&OW Rule-2016.
OUR ESTABLISHMENTS
  • To achieve our objectives and to resolve the problem of Industrial wastewater pollution of 680 units of GIDC-Vatva, GESCSL has set up the Environmental Infrastructure Facilities and Management Systems i.e.,
  • Common Effluent Treatment Plant aided with Advanced Oxidation technology - FCR (35 MLD) - for low TDS and Non-Biodegradable COD effluent
  • Multiple Effect Evaporator with 8 effects (300 KLD) - for high TDS effluent
  • Spray Dryers (3 Nos.-total 624 KLD capacity) - for very high TDS effluent
  • Secured Landfill Facility (Exhausted) - for safe disposal of Hazardous Solid waste
  • Novel Spent Acid Management Facility (Separate entity) for treatment and safe disposal of spent acid from the member units located in Odhav, Vatva and Naroda GIDC.
SOCIAL ACTIVITIES
  • We are operating polyclinic at Vatva in association with Vatva Industries Association (VIA).
  • Often, we are organizing blood donation camps jointly with VIA.
  • We are also organizing medical camps for the patient of dieses related to eyes, diabetes etc.
  • We have also carried out cleaning and replenishment of Vinzol pond near our CETP
  • We are also helping the affected people by distributing food packets, grain kits and water pouches during natural calamities.
  • We are distributing uniforms, note books to the students of nearby schools.
OUR CONTRIBUTION :
  • From the beginning, we are very actively working to control the environmental pollution and for protection of environmental quality.
  • We are constantly devoting our all the possible efforts and resources to maintain the clean environment.
  • We have adopted advanced technologies to achieve highest standards of performance in our EMS.
  • We are also active in creating environmental awareness in industry, public and workers.
  • We are always endeavoring to continually improve our capability in waste minimization, energy efficiency, cleaner production, treatment and disposal of waste.
1. Common Effluent Treatment Plant aided with Advanced Oxidation Technology - Fenton Catalytic Reactor (FCR)

Commissioned : September-1998
Treatment Capacity : 35 MLD
Land Area : 43000 sq. mt.
Cost of CETP : 149.41 crores (excluding land)
No. of members : 674 members
Type of Industry Total
Dyes, Intermediates & Chemicals 88%
Pharmaceuticals and Food Industries 4%
Textile Processing 3%
Engineering & Plastic Processing 3%
Ice Factories 2%
Total 100%
TREATMENT TECHNOLOGY:

A. Conventional Treatment :

Primary treatment consisting of physicochemical processes followed by Secondary treatment of Extended Aeration process.

B. Advance Oxidation Technology - Fenton Catalytic Reactor (FCR)

The treated effluent in conventional treatment go for further treatment in one of the world's most advanced oxidation technology called Fenton Catalytic Reactor (FCR) to reduce non- biodegradable matters from the effluent in order to achieve the GPCB discharge norms. This is the first installation in India. The FCR plant is in operation since December - 2021.

The FCR Plant - a dream project of Late Shri Shankerbhai Patel (Kaka), was inaugurated on 25th June 2021 by worthy hands of Shri Prakash Javadekarji, Hon'ble Minister of Forests, Environment and Climate Change, Government of India in the presence of Hon'ble Chief Minister of Gujarat Hon'ble Vijaybhai Rupani.

Establishment and operation of CETP is for the collection, treatment and safe disposal of treated effluent in to mega line after confirming effluent discharge norms of GPCB.

There is no Flow diversion line arrangements our CETP.

2. Multi Effective Evaporator
Commissioned : March-2014
Treatment Capacity : 300 KLD
Land Area : 6034.10 sq. mt.
Cost of CETP : 18 Crore (excluding land)
No. of members : 290 members

Treatment Technology:

GESCSL has installed MEE plant of 8 effects to treat and dispose of high concentrated effluent having up to 2,50,000 mg/L of TDS in effluent by the steam from coal fired Boiler.

3. Spray Dryers - 3 Nos.
Commissioned : One in January-2016 & rest of two commissioned in December-2017.
Treatment Capacity : Total 624 KLD
Land Area : 9042 sq. mt.
Cost of CETP : 24 Crore (excluding land)
No. of members : 290 members

Treatment Technology:

GESCSL has installed one Spray Dryer of 240 KLD capacity and other two Spray Dryers of 192 KLD capacity of each for treatment and disposal of high concentrated effluent having more than 2,50,000 mg/L of TDS in effluent by the coal fired Hot Air Generator.

4. Secured Landfill Facility
Commissioned : March-2003 to Nov.-2013
Capacity : Cell - 1 - 0.75 lakh MT
Cell - 2 - 3.00 lakh MT
Cell - 3 - 8.50 lakh MT
Total Capacity - 12.25 lakh MT
Land Area : 68881 sq. mt.
Invesment Cost : 16.20 crore (excluding land)
No. of members : 684 members

Treatment Technology:

SLD was established and operated for the safe disposal of hazardous solid waste being generated by member industrial units. The site has been closed from Nov-2013.

Currently, the site is capped by proper vegetation cover and planning to install 2 MW of Solar power Plant.

5. Novel Spent Acid Exchange Facility (seperate entity)

The concentration of sulfuric acid in the spent acid is normally in the range of 10- 30%. The individual industries find it difficult to store, handle or treat it effectively. It was therefore decided to establish this facility in the name of Novel Spent Acid Management.

Commissioned : November - 2009
Capacity : 1000 MT/Day
Land Area : 43927.43 sq. mt.
Cost of CETP : 36 crore (excluding land)
No. of members : 226 members

Treatment Technology:

SLD was established and operated for the safe disposal of hazardous solid waste being generated by member industrial units. The site has been closed from Nov-2013.

Currently, the site is capped by proper vegetation cover and planning to install 2 MW of Solar power Plant.